Directions for Chuck-Hole Patch
EASY TO USE STEP 1 – Locate and mark all chuck-holes and broken areas. Brush or sweep all dust and loose aggregate from each chuckhole. Clean each one down to…
read moreEASY TO USE STEP 1 – Locate and mark all chuck-holes and broken areas. Brush or sweep all dust and loose aggregate from each chuckhole. Clean each one down to…
read moreAPPLICATION: SURFACE PREPARATION: Clean surface for repair, removing loose debris, disintegrated concrete, oil, grease and dirt. Flush the area thoroughly REXROC is a one component cement that sets up ready…
read moreAfter thoroughly mixing with water, pour the material into the hole to be repaired and level the patch with the surrounding concrete. Use a mortar-type mixer for large jobs. For…
read moreMinimum Coverage The following coverage rates are minimums only. If asphaltic roofs are dried out, apply a coating of ROOF PRIMER before the application of FIBERED A.R.C. . Metal Roofs…
read moreShake well before using. Clean surface thoroughly. Hold can 6 to 8 inches from surface and apply even, thin coats. Allow 1 to 5 minutes for adequate drying. The concentration…
read moreDIRECTIONS FOR USE Shake well before using. Remove protective cap. Hold can 6 to 8 inches from surfaces to be sprayed. Apply an even coat to surface. Turn on machinery and…
read moreDIRECTIONS FOR USE: When used through high pressure equipment with direct chemical injections, FLEET KLEEN can be metered directly from its container at a ratio of 1:50 for most applications when…
read moreDip, pump or scoop a small amount from the 4½ lb. container or squeeze a small amount from 15 oz. tube and place in palm of your hand. Rub hands…
read moreUse 1 to 3 ounces of GREEN FURY to one gallon cold or warm water, depending on soil. Apply solution to pre-rinsed equipment – allow to set approximately 5 minutes. Swab heavily…
read more